10 YEAR FACILITIES MASTER PLAN

2018 Master PlanThe Board approved a Ten Year Facilities Master Plan on January 27, 2015. The plan consists of large repair/maintenance projects, including roofing and mechanical replacements, as well as proposed capital projects such as new construction. The initial Master Plan was built on feedback from a variety of stakeholders in our District and a comprehensive facilities condition assessment by Alpha Facilities Solutions in 2014.  The Facilities Master Plan is updated on an annual basis by facilities staff assessments and ongoing feedback from each site’s administration.  

PROJECTS IN PLANNING AND CONSTRUCTION

LBHS Stadium UpgradeLBHS Stadium Restroom-Storage Building

The new Laguna Beach High School athletic stadium building will provide needed restroom, storage, and concession facilities. The single-story masonry building is located adjacent to the visitor bleacher area between the track and the baseball field. Construction is planned to be from June 2018 – January 2019.



Artist Theater UpgradeLBHS Artists Theater Upgrades

The Artists Theater located at Laguna Beach High School is being upgraded to provide improved accessibility to and within the Theater. Included within the upgrades is enhanced wheelchair access, handrail provisions, electrical improvements, and fire alarm upgrades.   Construction is planned to be June 2018 – August 2018.




Energy Efficiency Project LBUSD – Energy Efficiency / Prop 39

The lighting at all District facilities is audited and converted from various lighting technologies to LED. Mechanical systems requiring replacement are upgraded with high-efficiency air conditioners, furnaces, and equipment. The project includes the provision of air conditioning at the LBHS Dugger Gym and also a complete HVAC replacement at the LBHS Artists Theater. Construction is planned to be April 2017 – August 2018.

RECENTLY COMPLETED PROJECTS

TOW Classroom Replacement

TOW Classroom AdditionAt Top of the World Elementary School, three (3) portable classroom buildings were removed and replaced with permanent modular classroom buildings. The three (3) new energy efficient and sustainable buildings include high ceilings, natural light, and designs that actively engage young students. The project was completed December 2017.




LBHS Stadium Track & Turf Replacement with Drainage Improvements

Turf Replacement ProjectThe Laguna Beach High School stadium track rubber and synthetic turf was replaced with new durable high-performing systems. The polyethylene and nylon blended turf fibers provide a soft, but durable playing surface complete with shock absorbent padding. The project was completed August 2016.

For additional assistance or questions please contact Ryan Zajda at (949) 497-7700 ext. 5213 or by email at rzajda@lbusd.org.